Valvoline Headquarters
Lexington, KY
Ben Hur was contracted to erect 189 precast panels on the new Valvoline World Headquaters Office Bldg. The project required the use of a 100ton Linkbelt Crawler Crane to hoist 183 panels onto the structure. The heaviest panels weighed in excess of 20,500lbs. We also erected 6 panels on the underside of the structure with a 12,000lb Telehandler style fork lift. Many of the precast panels were installed at a slope giving this project a unique look. The 4 story structure was shaped like a giant “V” for Valvoline and the precast cladding added to its overall curb appeal.