top of page

Project Gallery

Norton Hospital

Ben Hur Steelworx was contracted to fabricate and erect 1100 tons of structural steel for this hospital addition. Coordination and sequencing was imperative as the existing hospital remained fully operational during construction.

Project Gallery

ben%252520hur%252520png_edited_edited_ed
BenHurLogoSW_edited_edited.png
  • Facebook
  • LinkedIn

©2020 Ben Hur Construction Co. All Rights Reserved

bottom of page